Baspa Hydroelectric Project

Baspa Hydroelectric Project.jpg

Baspa Hydroelectric project has an installed and approved capacity of 300 Megawatt. The type of project is Major. Since, it is greater than 25 Megawatt. The status of the power station is Operational. The source of water for power production is from Baspa River. Its basin is Indus River. The power plant is located in North Hydroelectric Region. The Owner and Operator of the power plant is JSW Energy. The beneficiary states of this hydroelectric power station are Himachal Pradesh and other North Indian States.

The construction of the power project was completed in 2003. Soon after the construction of Power plant, it started its commercial operation in 2003 itself. The type of Turbine used in the power plant is Pelton. The total number of turbines in the power are 3 and capacity per Turbine is 100 MW. So the total installed capacity would be 300 MW. The Unit Size of the power plant is 300 Megawatt (3 units x 100 Megawatt). There are 3 units in Operation, having an installed capacity of 100 Megawatt each. All the units are commissioned.

How to Reach:Baspa Hydroelectric Station is erected in the Kinnaur district of Himachal Pradesh. You can reach this hydroelectric power station via Road, Rail or Air. Baspa Power Plant is located at about 70 km away from power plant. You can arrive the power station from Kinnaur via Road. Regular Buses and Taxi Cars are available from Kinnaur to the power station. The most convenient way of travelling to Power Station is by Bus. The nearest railway station to Kinnaur is Kalka railway station, which is located at about 350kilometer from Kinnaur. The nearest airport is Dehradun Airport, which is located at about 154 km from Kinnaur.

Project Details:

• Hydroelectric Project Name – BaspaII Hydroelectric Project

• Commission Date –

• Approved Capacity in MW – 300 Megawatt

• Installed Capacity in MW – 300 Megawatt

• Type of Project – Major (Since, greater than 25 MW)

• Status – Operational

• Water Source – Baspa River

• Basin – Indus

• Hydroelectric Region – North Hydroelectric Region

• Owner – JSW Energy

• Address – Baspa Hydroelectric Project, Kinnaur, Himachal Pradesh

• District – Kinnaur

• State – Himachal Pradesh

• Contact Number – +91 22 4286 1000

• Fax – +91 22 4286 3000

• Email – contact@jsw.in

• Website – www.jsw.in

• Beneficiary States/ Union Territories – Himachal Pradesh and other North Indian states

• Completion of Power Project– 2003

• Turbine Type – Pelton

• Unit Sizes – 300 MW (3 units x 100 MW)

• Total Units – 3

• Units Commissioned – All Units are commissioned