Ganderbal Hydroelectric Project
Ganderbal Hydroelectric Project is commissioned in 1961. It has an installed and approved capacity of 15 Megawatt. The Type of Project is Small, since the capacity is between 3 Megawatt and 25 Megawatt. The status of power plant is completed and are Operational. The source of water for the generation of power is Sindh Nallah, which is a tributary of Jhelum and the basin is Jhelum River. The power station is located at North Hydroelectric Region. The power plant is managed by the Jammu & Kashmir State Power Development Corporation Limited.
The beneficiary states of this hydroelectric power station is Jammu & Kashmir. The type of power house is Surface. The completion of Power Project was in 1961 and the Turbine Type is Francis. The total number of Turbines in the power plant is 4 and capacity of first and second unit is 3 MW each and the capacity of remaining two units were 4.5 MW each. So the entire installed capacity is 15 Megawatt. The manufacturer of both Turbine and Generator of the power plant is Escher wyss - Switzerland, Ganz Mavag - Hungary. The height of Rated Head of turbine is 137 m. The specific speed of turbine is 2 x 1000 rpm and the rated speed is 1000 rpm.
The Unit Sizes of the power plant is 15 MW (2 units x 3 Megawatt & 2 units x 4.5 Megawatt). There are four units in operation and all the four units are commissioned. The first two units are commissioned with an installed capacity of 3 Megawatts each and after that the remaining two units are commissioned with an installed capacity of 4.5 Megawatt each.
How to Reach: Ganderbal Hydroelectric Project is established at the Ganderbal village, which is 20 km from the summer capital of Jammu & Kashmir - Srinagar. You can reach this power station via Road, Air or Rail. Regular Buses and Taxi Services are available from Srinagar to Power Station. Srinagar International Airport is the nearest airport and Srinagar railway station is the nearest Railway Station.
Project Details:
• Hydroelectric Project Name – Ganderbal Hydroelectric Project
• Commission Date – 1961
• Approved Capacity in MW – 15 Megawatt
• Installed Capacity in MW – 15 Megawatt
• Type of Project – Small (between 3 MW and 25 MW)
• Status – Completed and Operational
• Water Source – Sindh Nallah, a tributary of Jhelum
• Basin – Jhelum River
• Hydroelectric Region – North Hydroelectric Region
• Purpose – Hydroelectric
• Owner – Jammu & Kashmir State Power Development Corporation Limited
• Address – Ganderbal, 20 km from Srinagar, Jammu & Kashmir
• District – Srinagar
• State – Jammu and Kashmir
• Contact Number – +91 194 2483783
• Fax – +91 194 2451665
• Email – jkspdcl@gmail.com
• Website – www.jkspdc.nic.in
• Beneficiary States/ Union Territories – Jammu & Kashmir
• Type of Power House – Surface
• Completion of Power Project– 1961
• Turbine Type – Francis
• Turbine Manufacturer – Escher wyss - Switzerland, Ganz Mavag - Hungary
• Generator Manufacturer – Escher wyss - Switzerland, Ganz Mavag - Hungary
• Unit Sizes – 15 MW (2 units x 3 MW + 2 units x 4.5 MW)
• Total Units – 4
• Units Commissioned – All the four units are commissioned.