Hyderabad APSRTC Wind Farm
The Hyderabad APSRTC Wind Farm is situated at Ramagiri, Anantapur district, Andhra Pradesh, India. The total design capacity of Hyderabad APSRTC Wind Farm is 10 MWe.
This is a fully operating farm in Anantapur district and is an on shore type wind farm. The plant has only one unit and the unit was commissioned in October 1995. Andhra Pradesh State Rapid Transit Corp. is the owner and the operating company of the power plant. The localisation details of the power plant are Latitude:-17° 22' 47.9", Longitude:- 78° 29' 23.9". The main advantage of this Wind Farm is that the wind is available in plenty and was free of cost for the implementation of power plant. Also it is less costly since the wind is a renewable source of energy. Another benefit of this APSRTC wind farm is there is no pollution from using the plant. The windfarm with big wind turbines are installed for power plant for generation of power. The wind speed at this Ramagiri is around 25 km and is available throughout the year.
How to Reach: Hyderabad APSRTC Wind Farm is located in the Ramagiri town of Anantapur district in Andhra Pradesh. Anantapur railway station is the nearest railway station and Puttaparthi Sri Sathya Sai Airport is the nearest airport.
Project Details:
• Project Name – Hyderabad APSRTC Wind Farm India
• Commissioned Year – 1995
• Total Installed Capacity in MW – 10 MWe
• Status of Plant - Fully operating power plant
• On shore/off shore - on shore
• Owner of the plant - Andhra Pradesh State Rapid Transit Corp.
• Geodetic system - WGS84
• Precise localization - no.
• Address - Ramagiri, Anantapur district, Andhra Pradesh, India
• District – Anantapur district
• State – Andhra Pradesh
• Unit Sizes – 1 x 10 MWe
• Units Operational – 1
• Unit Commissioned – All units are commissioned