Pykara Pushep Hydroelectric Power Plant
Pykara (PUSHEP) Ultimate Stage Hydroelectric Power Plant is erected in the Pykara, Mukurthi and Sandynallah Rivers of Nilgris district in Tamil Nadu. The power project is commissioned in 2005 with an installed capacity of 150 MW. The type of project is ‘Major’ and the type of plant is Water released from another project is utilized by this plant. The Main Reservoir of the plant is Pykara Mukurthi and Sandynallah reservoirs. The Hydroelectric Region where the power station is located is Southern Hydroelectric Region of the country. The power station has an Underground powerhouse having 3 units of 50 MW turbines. The source of water for the generation of power is from Pykara, Mukurthi and Sandynallah Rivers.
The power project is owned by the Tamil Nadu State Government under the control of Tamil State Electricity Board. The Operating Company of the power station is Tamil Nadu Generation and Distribution Corporation Limited (TANGEDCO). The beneficiary state of the power plant is Tamil Nadu. The power project is completed and started its operations in 2005. There are three turbines in the power house and capacity per Turbine of power house is 50 MW. The Unit Sizes of the power plant is 150 MW. There are three units in operation and all the three units are commissioned.
How to Reach: Pykara Pushep Hydroelectric Power Station is located at about 11 km South of Moyar in the Nilgris District of Tamil Nadu in India. You can reach this destination by Road, Rail or Air. Nilgiris is about 9 Km away from Ooty and 58 Km away from Mettupalayam. So the nearest railway station is Ooty Railway Station and the nearest airport is Coimbatore International Airport.
Project Details:
• Name of Project – Pykara (PUSHEP) Ultimate Stage Hydroelectric Power Project
• Commission Date – 2005
• Approved Capacity in MW – 150 MW
• Installed Capacity in MW – 150 MW
• Hydroelectric Basin - East Flowing Rivers
• Type of Project – Major (> 25 MW)
• Type of Plant – Water discharged from another project
• Hydroelectric Project Status – Completed and Operational
• Main Reservoir - Pykara Mukurthi and Sandynallah reservoirs
• Hydroelectric Region – Southern Hydroelectric Region
• Configuration of Powerhouses - Underground powerhouse with 3 x 50 MW turbines
• River – Pykara, Mukurthi and Sandynallah Rivers
• Owner – Tamil Nadu State Government
• Operating Company – Tamil Nadu Generation and Distribution Corporation Limited (TANGEDCO)
• Address – 11 km South of Moyar, Nilgris District, Tamil Nadu, India
• Nearest City – Nilgris
• District - Nilgris
• State – Tamil Nadu
• Contact Number – 044-28520409
• Email – cehe@tnebnet.org
• Website – www.tangedco.gov.in
• Beneficiary States/ Union Territories – Tamil Nadu
• Completion of Power Project – 2005
• Number of Turbines – 3
• Capacity per Turbine – 50 MW
• Unit Sizes – 150 MW
• Total Units – 3
• Units Commissioned – All the three units are commissioned