Sholayar I Hydroelectric Power House

Sholayar I Hydroelectric Power House.jpg

Sholayar I Hydroelectric Power House is erected in the Sholayar River of Sholayar Dam City in the Coimbatore District of Tamil Nadu in India. The first unit of power house is commissioned in 1971. The approved and total installed capacity of power house is 70 MW. The basin of power house is Sholayar River. The hydroelectric basin of the power plant is East flowing rivers. The type of power project is Major (greater than 25 MW) and the type of plant is having a dam on the river with reservoir. The status of the power plant is Operational. The Main Reservoir of the plant is Upper Sholayar Reservoir. The power house is located in the country’s Southern Hydroelectric Region. The River on which the hydroelectric power house is situated is Sholayar River.

The Owner of the power house is Tamil Nadu State Government and the operating company of the power house is Tamil Nadu State Electricity Board under the control of TANGEDCO. The Tamil Nadu is the only beneficiary state of the power house. The construction of power house was completed in 1971 and soon it started its operations. The turbine type of the plant used in the power house is Vertical Francis. The manufacturer of Turbine of the power plant is by the Litostroj Yugoslavia and the manufacturer of Generator of the power plant is by the Rade-Konchar Yugoslavia. There are two turbines in the power house and capacity of that turbine is 35 MW. There are two units in the plant and the total installed capacity of the plant is 70 MW. All the two units in the power house are commissioned.

How to Reach: Sholayar I Hydroelectric Power House is located in the Sholayar Dam City of Coimbatore in Tamil Nadu. You can reach this power house via Road, Rail or Air. Coimbatore Railway Station is the well-connected Railway Station and Coimbatore International Airport is the closest Airport.

Project Details:

• Name of Project – Sholayar I Hydroelectric Power House Tamil Nadu

• Commission Date – 1971

• Approved Capacity in MW – 70 MW

• Installed Capacity in MW – 70 MW

• Basin – Sholayar River

• Hydroelectric Basin - East Flowing Rivers

• Type of Project – Major (> 25 MW)

• Type of Plant –Dam on river with Reservoir

• Hydroelectric Project Status – Operational

• Main Reservoir - Upper Sholayar Reservoir

• Hydroelectric Region – Southern Hydroelectric Region

• River – Sholayar River

• Owner – Tamil Nadu Government

• Operating Company – TANGEDCO

• Address – Sholayar Dam City, Coimbatore District, Tamil Nadu

• Nearest City – Coimbatore

• District - Coimbatore

• State – Tamil Nadu

• Contact Number – 044-28520409

• Email – cehe@tnebnet.org

• Website – www.tangedco.gov.in

• Beneficiary States/ Union Territories – Tamil Nadu

• Completion of Power Project – 1971

• Turbine Type - Vertical Francis

• Turbine Manufacturer - Litostroj Yugoslavia

• Generator Manufacturer - Rade-Konchar Yugoslavia

• Number of Turbines – 2

• Capacity per Turbine – 35 MW

• Unit Sizes – 70 MW

• Total Units – 2

• Units Commissioned – All the two units are commissioned