Karbi Langpi Hydroelectric Project

Karbi Langpi Hydroelectric Project.JPG

Karbi Langpi Hydroelectric Project is located in the Borpani River on Karbi Dam of Karbi Anglong district in Assam. The first unit of power project is commissioned in 2007 with an installed capacity of 50 MW. The total installed capacity of power plant is 100 MW. The current status of power project is Operational. The type of plant is a Dam with Run of the River generation. The name of dam, where the project is erected is Karbi Dam and the type of Dam is Concrete Gravity Dam. The water source for power generation is Borpani River and the basin is Brahmaputra. The power plant is erected in the North Eastern Hydroelectric Region of the country.

The owner of the power plant is Assam State Government and the operating company is Assam State Electricity Board (ASEB). The total number of Turbines installed in the power house is two and the type of turbine used is Francis. The maker of both Turbine and Generator of the power house is by the Fuji Japan. Here the specific speed of Turbine in the power house is 500 rpm. The total number of plant units is two and all are commissioned. So the unit size of the plant is 100 MWe having two units of 50 MW each.

Project Details:

• Hydroelectric Project Name – Karbi Langpi Hydroelectric Project

• Commission Year – 2007

• Seismic Zone - Seismic Zone-V

• Total Installed Capacity in MW – 100 MWe

• Project Type – Major (> 25 Megawatt)

• Hydroelectric Project Status – Operational

• Hydroelectric Development Type - Run of the River

• Completion Year – 2007

• Name of Dam - Karbi Dam

• Type of Dam - Concrete Gravity Dam

• Water Source – Langpi (Borpani) River

• Basin – Brahmaputra

• Hydroelectric Region – North Eastern Hydroelectric Region

• Hydroelectric Basin - Brahamaputra Basin

• Owner – State Government

• Operator – Assam State Electricity Board (ASEB)

• Address – Karbi Anglong District, Assam

• District – Karbi Anglong

• State – Assam

• Contact Number – 0361-2739528 (Key Official of ASEB), 0361-2313069

• Website – www.apdcl.org

• Type of Turbine – Francis Turbine

• Number of Turbines used- 2

• Turbine Manufacturer – Fuji Japan

• Generator Manufacturer – Fuji Japan

• Net Max/ Min Head - 235 m

• Minimum Draw Down Level for Powerhouse – 308 m

• Annual Design Energy - 390 MU

• Specific Speed of Turbine - 500 rpm

• No. of Penstock – 2

• Length of Penstock - 252 m

• Unit Sizes – 2 units X 50 MW (100 MWe)

• Total Number of Units - 2

• Units Commissioned – All the two units are commissioned.